Mai Dubai Factory Expansion Dubai, UAE

CLIENT

Mai Dubai

CONSULTANT

Archcorp Architectural Engineering

BUILT UP AREA (m²)

41,850

SCOPE OF WORK

Build Only

FOOD SECURITY | FOOD PROCESSING

Mai Dubai Factory Expansion

The project is an expansion of Mai Dubai’s current facility which will allow Mai Dubai to raise the level of competition in the bottled water industry, locally and globally, by implementing best practices and the latest technologies in this field.

The operations of the facility are fully automated; starting from the arrival of raw material in the warehouses till the very end, that is the loading of the bottled water onto trucks for dispatch. Even the internal transport is done by monorails, with zero human intervention contributing to a near 100 per cent hands-free operations

The Mai Dubai Project is located in Al Yalayis 2, Dubai and consists of the following;

  • Main factory
  • Head office
  • Security room
  • Driver’s Room
  • Driver’s Rest Area
  • RMU Room with Substation
  • L.V. Room
  • Pet Resin Handling
  • Pump Room
  • Chiller Room
  • Pet Waste Handling
  • U/G Raw Collection Water Tank
  • Sprinkler Pump Room
  • Garbage Yard 1
  • Garbage Yard 2

2018

Completion Year