Transport & Logistics – Aviation
Zayed International Airport
A large-scale aviation fueling infrastructure project for the South Airfield Development and Midfield Terminal, including the Design & Build of a new Fuel Hydrant System with tie-ins to the ADNOC Fuel Farm. The works comprised engineering, construction, installation, and testing of approximately 26 km of 36-inch fuel hydrant pipelines, hydrant pits, valves, control systems, and upgrades to the North Fuel Depot.